Data modification

Asked by Walter Traunmüller

create for example a powerpoint-file, put it into the library and display it on the client...ok, works

Now you have to modify the powerpoint-file.

Save the modified file directly into the library or should I remove the old file from the library an put the new one in to it ? Inthis cast I must reconfigure the timeline?

Wich method is recommended?

Question information

Language:
English Edit question
Status:
Solved
For:
Xibo Edit question
Assignee:
No assignee Edit question
Solved by:
Alex Harrington
Solved:
Last query:
Last reply:
Revision history for this message
Alex Harrington (alexharrington) said :
#1

You edit the layout, edit the PowerPoint item in the region timeline and upload the new version there.

Revision history for this message
Dan Garner (dangarner) said :
#2

In the development preview you can also update it in the library page by editing it, uploading a new revision and ticking the box to update in all layouts.

Revision history for this message
Walter Traunmüller (ifk2ce) said :
#3

Alex,
this works, I didnt know, that I can save a modified file in library with the same name.

But within my production environment I have 4 clients with different layouts, but the same file in the timeline, so I have to edit each timeline.

Dan,
yout method would be better for me, but: WHERE is the box to "Update in all layouts" ?? I cannot find it.

Revision history for this message
Best Alex Harrington (alexharrington) said :
#4

The Update in all Layouts is only in the very latest development preview release. It won't be available in a stable Xibo until 1.4.0 is released.

If you're still using 1.2 series then for now you'll have to edit the content on each layout.

Alex

Revision history for this message
Walter Traunmüller (ifk2ce) said :
#5

tx