Could use more countdown time for clearing cache
Asked by
paul1149
It would be good to have more time before the scheduled restore point is set, so that I could close progs and run bleachbit. This would save a good 1gb each time, in disk space and backup time. Something like 3 min would be good for me.
BW
Question information
- Language:
- English Edit question
- Status:
- Answered
- For:
- Systemback Edit question
- Assignee:
- No assignee Edit question
- Last query:
- Last reply:
Can you help with this problem?
Provide an answer of your own, or ask paul1149 for more information if necessary.
To post a message you must log in.