is it allowed to change a scheduled event (instead of a manually created event)
Asked by
Zhang Weiwu
Hi. I am quite confused at this.
1. Schedule a section by selecting a time table and check the periods.
2. A lot of new events are then created for this section as I scheduled them.
Can I change the start time or date of one of the single event that is scheduled as above? I thought I can, as I did with a pilot system several months ago. But now I found on the production system if I click "Edit event" I am offered to change only the description of event. I think I have full permission (manager).
Thanks.
Question information
- Language:
- English Edit question
- Status:
- Solved
- For:
- SchoolTool Edit question
- Assignee:
- No assignee Edit question
- Solved by:
- Tom Hoffman
- Solved:
- Last query:
- Last reply:
To post a message you must log in.