Can I trace back my average cost for a specific product?
Asked by
Joel Cabral
Good Day!
I have this situation where I should have a trace back of my previous average cost.
Let say as of March 20, I have an average price of 22.00 for product A. On March 21, my average cost for product A becomes 23.00. Then my actual date of production is March 20 but encoded my production order march 21 and set my scheduled date to march 20.
First question, what would be the cost that specific production? Is it the cost on my scheduled date? Can I trace back the previous average cost?
Reply would be very much appreicated.
thanks,
Question information
- Language:
- English Edit question
- Status:
- Solved
- Assignee:
- No assignee Edit question
- Solved by:
- Vinay Rana (OpenERP)
- Solved:
- Last query:
- Last reply: