calculation cross section for full process
I have considered a process is given below,
p p > D+ D-
for one set of parameter xsection is 0.019 pb. and this numer is correct.
Now if we consider the process
p p > D+ D-, D+ > h+ DO, D- > h- DO.
then I have faced some erroneous results. First of all when we consider the process, we allow the decay of D+/D-.
So that I would expect that the number 0.019 should be multiplied by the respective branching fraction. Now in our case, the branching fraction of (D- > h- DO) is almost 100%. so the cross section should be of the order of 0.019. But the actual cross section which I obtained ~ 10^-13 pb. and also this number is vary in different time.
However throughout process madgraph not shown ay kind of error or warning.
So how can I get proper result for the process with longer chain.
Question information
- Language:
- English Edit question
- Status:
- Answered
- Assignee:
- No assignee Edit question
- Last query:
- Last reply:
Can you help with this problem?
Provide an answer of your own, or ask Avirup Shaw for more information if necessary.